 |
 |
Pub Renovation Project The SFSS has engaged the services of designers, architects, contractors and consultants to work with the Pub management and the Board of Directors to renovate the Highland Pub. Preliminary design work and consultations were completed in Spring 2010. The working drawings are displayed below.
renovations
 patio |
 millwork |
 furniture plan |
 finishes |
 reflected ceiling |
 elevations 1 |
 elevations 2 |
 millwork details |
 millwork details 2 |
 chairs and tables |
| |
These working drawings will be used by the engineers and contractors to
develop detailed cost estimates.
design visualization
 coat check |
 coat check and lower lounge entry |
 corner of service bar looking at main stage and entry |
 end of service bar at self service |
 looking at the secondary stage |
 looking at the main stage from the main room |
 looking down to the lower lounge from the upper lounge |
 looking up to the upper lounge |
 lower lounge |
 lower lounge from new service bar |
 lower lounge looking to service bar |
 main dance floor |
 main room looking towards service bar |
 main room view |
 overlooking lower lounge from dance floor |
 party area at dance floor level |
 pool and games area |
 main entry from below |
 stair case from lounge |
 top of first stair case |
 top of second staircase |
 top of stairs in main pub |
 upper lounge |
 upper lounge looking north |
 upper lounge looking south |
| | |
These images show visualizations of how the completed renovation could look.
|